The safety precautions to be taken into account during the installation and debugging process of fully automatic pipe cutting machine equipment are often important. Mechanical equipment is a high-end and precise machine tool production and processing equipment in terms of configuration. During the debugging process, not only professional debugging personnel are needed, but also debugging personnel need to have professional debugging basic knowledge. The various issues faced during the debugging process are related to the high-quality functional performance that the entire chamfering machinery equipment can achieve in the production chain. The machine tool must be placed on a horizontal ground and fixed to the ground with bolts according to the four screw holes of the machine base to correct the level.


Place the pipe into the clamping mold, with the end face of the pipe retreating 6-10mm away from the front positioning plate. Step on the foot switch and adjust the cylinder throttle valve and stroke throttle valve gradually from slow to suitable. Place the pipe to be processed into the clamping mold to the front positioning, step on the foot switch, and proceed with processing.
The fully automatic pipe cutting machine is a small precision machine tool specialized in chamfering, milling, planing and other processing methods for products in mold manufacturing, hardware machinery, machine tool manufacturing, hydraulic parts, valve manufacturing, textile machinery, etc. Place the pipe to be processed into the clamping mold, and the end face of the pipe should retreat 2-2.5mm away from the front positioning plate. Without starting the motor, manually chamfer the handle to move the pipe forward. Visually inspect the end point of the forward movement. At this time, the inner and outer chamfering blades should meet the pipe, and the end face blade should be about 1mm away from the end face of the pipe. At the same time, the travel switch should also be turned on. If there is a deviation, adjust the front positioning, blade, and travel switch adjustment screws to the appropriate position, connect the power supply, and start the equipment to manually test the processing of the pipe.




佛山锋顺机械科技有限公司

Foshan Fengshun Machinery Technology Co., Ltd. - Manufacturer of metal pipe forming automation processing equipment

Foshan Fengshun Machinery Technology Co., Ltd. is a large-scale modern production enterprise specializing in the development, research and design, production and processing of commercial refrigeration equipment. 13 years of focus on the research and manufacturing of fully automatic aluminum cutting machines/pipe cutting machines/pipe bending machines/chamfering machines

Online consultation在线咨询
Consultation Hotline +86-0757-85611348